Speas Fish Hatchery

The site is nestled along the North Platte River near the historic Bessemer Bend amongst the red bluffs of the Coal Mountain foothills. The project continues earlier additions of production buildings on the site with a fish incubator production building and feed storage shed along with the latest in water filtration technology to purify the production system's spring-fed waters along with electrical redundancy and water bypass to protect the fish stock in the event of power failure. The natural spring waters, their seasonal flows and elevations dictated the location of the structure, which in turn included the challenge of mitigating collapsing soils at the site prior to construction. Also included is a small public fishing pond – Jessica's Pond - downstream from the facility made possible by diverting effluent water from the hatchery. The site is ADA accessible and includes a fishing platform.

Letter of Reference from Steve Sharon Tanks

 

 

Location
Casper, Wyoming

Owner
Wyoming Game and Fish Department
Steve Sharon, (Retired) Fish Culture Supervisor
307-262-6679

Contractor
Wright Brothers
Mike McHargue, Superintendant
307-655-2548

Role
Consulting Architect

Personnel
Lyle Murtha, Principal Architect
Anthony Jacobsen, Project Manager

Scope
New Construction
Design-Bid-Build

Size
9,180 Square Feet - Fish Hatchery Building
3,200 Square Feet - Feed Building

Cost
$2 Million

Completed
2011